Completed Plants

 Power Plant Name


  • Location
  • Type
  • Source
  • Mechanical Installed Power (MW)
  • Electrical Installed Power (MW)
  • Annual Energy Production (GWh)
  • Head (m)
  • Capacity (m³/s)
  • Equipment
  • Construction Time

Değirmenüstü HPP


  • Andırın/Kahramanmaraş
  • Regulator
  • Körsulu River
  • 40,821 MW
  • 40,005 MW
  • 114,26 GWh
  • 297 m
  • 15,34 m³/s
  • 3 Vertical Axis
    Pelton Turbine
  • 2006-2008

Sefaköy Dam & HPP


  • Kağızman/Kars
  • Dam
  • Aras River
  • 35 MW
  • 33,11 MW
  • 141,35 GWh
  • 44 m
  • 93,62 m³/s
  • 2 Vertical Axis
    Francis Turbine
  • 2008-2011

Doğankaya HPP


  • Tut/Adıyaman
  • Regulator
  • Göksu River
  • 21,23 MW
  • 20,55 MW
  • 82,71 GWh
  • 41,72 m
  • 60 m³/s
  • 3 Vertical Axis
    Francis Turbine
  • 2009-2012

Kasimlar I HPP


  • Sütçüler/Isparta
  • Dam and Regulator
  • Ayvali/Köprüçay River
  • 25,75 MW
  • 25,00 MW
  • 68,56 GWh
  • 83,00 m
  • 34 m³/s
  • 2 Vertical Axis
    Francis Turbine
  • 2012-2016

Kasimlar II HPP


  • Sütçüler/Isparta
  • Dam and Regulator
  • Ayvali/Köprüçay River
  • 76,68 MW
  • 74,46 MW
  • 199,74 GWh
  • 268,50 m
  • 34 m³/s
  • 2 Vertical Axis
    Francis Turbine
  • 2012-2016




Ongoing Plants

 Project Name


  • Location
  • Type
  • Source
  • Mechanical Installed Power (MW)
  • Electrical Installed Power (MW)
  • Annual Energy Production (GWh)
  • Head (m)
  • Capacity (m³/s)

Derya


  • Gümüşhane/Torul
  • Regulator
  • Harşit River
  • 13,93 MW
  • 13,378 MW
  • 45 GWh
  • 103 m
  • 15 m³/s

Gök


  • Bilecik/Osmaneli
  • Regulator
  • Sakarya River
  • 9,63 MW
  • 9,11 MW
  • 50 GWh
  • 8 m
  • 100 m³/s

Nur HPP


  • Pazarcık/
    Kahramanmaraş
  • Rubber Dam
  • Aksu River
  • 18,25 MW
  • 17,71 MW
  • 53,120 GWh
  • 78 m
  • 26 m³/s


Completed Plants