The Project includes the complete construction of the Motorway between Sile-Trans European Motorway Cayirova Interchange. Construction of all Infrastructure, Pavement, Culvert, Structures are in the scope of the project. The motorway is being constructed with 2x2 lanes with the total length of 28 km.

Client : Republic of Turkey General Directorate of Highways 1st Region
Location : Izmit, Turkey
Construction Period : 1995-2001 (Extension of time granted)

       

PROJECT MAIN QUANTITIES

       
Earthworks Pavement Works Concrete Works Steel Reinforcement
1,640,000 m³ 317,000 ton 20,000 m³ 1000 ton
       
Interchange Culvert Bridge  
1 pcs 30 pcs 2 pcs  
       