DERYA II HBB | GÜLSAN HOLDİNG

DERYA II HBB


(Under Construction)

Client: GAE Inc.
Location: Gumushane/Turkey
Construction Period: 2 years



       

PROJECT MAIN QUANTITIES

       
Rate of Flow Gross Height Net Height Installed Capacity
32 m3/s 75.00 m 72.68 m 25.88 MW
       
Firm Rate of Flow Firm Energy Secondary Energy Total Energy
2.70 m3/s 14.85 GWh 66.45 GWh 81.31 GWh 
       