KAZAKHSTAN ALMATY-KHORGOS MOTORWAY PROJECT | GÜLSAN HOLDİNG

KAZAKHSTAN ALMATY-KHORGOS MOTORWAY PROJECT


(Under Construction)

With a length of 112 kilometers in the 1B category, this project attempts the 2x2 construction of a highway to present an alternative to the main artery connecting Almaty-the largest city of Kazakhstan-with the People’s Republic of China. The highway’s super structure is composed of 25 cm concrete laying, 18 cm of cemented foundation and 33 cm of sub-base. The laying thickness is 9.25m x 2m and total width of the highway platform is 27.5 m. This project contains, 7 bridged junctions, 1 railway overpass, 15 underpasses, 30 bridges and 270 headwalls.

Client: Ministry of Transport and Communications
Location: Kazakhstan, Almaty
Construction Period: 30 months




       

PROJECT MAIN QUANTITIES

       
Road Section Length Road Category Lanes Carriageway Width
111.743 Km 1b 2x2 9.25m x 2
Road Platform Width Pavement Type Number of Junctions Number of Interchanges
27.5 m Rigid Pavement 34 7
Number of Railway Overpass Number of Underpasses Number of Bridges Number of Culverts
1 15 30 270
Filling Quantity Concrete Pavement Quantity Hotmixed Bituminous Asphalt Course Crushed Stone Base Course Quantity
10 530 844 m³ 603 793 m³ 166 000 tons 680 066 m³
       


© 2016 Gülsan Holding Tüm Hakları Saklıdır.