Relocation of the TCDD Railway Section between Km: 65+830 – 67+244 to a Variant Alignment on the D-100 State Road Gebze–Izmit Section.
RAILWAY CONSTRUCTION PROJECT
Construction
As part of the realignment of the TCDD railway line, the project included 250,000 m³ of earthworks, 35,000 m³ of structural concrete for engineering structures, the installation of prestressed precast sleepers, and the execution of electromechanical systems.
Client: General Directorate of Highways 17th Regional Directorate
Location: Izmit, Türkiye
Construction Period: 2009-2010