This project covers the construction of the motorway section between TEM Çayırova Interchange and Şile, including roadworks, engineering structures, asphalt paving, and superstructure works.
Construction
The scope includes all earthworks, superstructure applications, major and minor engineering structures, traffic signage, and landscaping works. The road is designed as a 2x2 lane dual carriageway with a total length of 28 kilometers.
Client: General Directorate of Highways 1st Regional Directorate
Location: Izmit, Türkiye
Construction Period: 1995-2001