Construction of Infrastructure, Grade-Separated Junctions, and Side Roads for the European Motorway Section 2: Mahmutbey–Airport Connection.
Construction
Located in Istanbul, this project involved the complete construction of infrastructure, engineering structures, interchanges, and service roads for the connection route. The motorway was built with a total length of 20 km and a 2x2 lane configuration.
Client: General Directorate of Highways
Location: Istanbul, Türkiye
Construction Period: 1983-1987