CONSTRUCTION of PERTEK - TUNCELİ ROAD

Construction Works of the Pertek-Tunceli Junction Road between km: 24+500 – 57+538.04 Section.



Route of the project is located between Elazığ ferry intersection and Tunceli-Elazığ road junction. The total length of the road is 33 km.

Construction

Construction of Pertek - Tunceli Road
Technical Information

Construction Methodology


Length of the road passing though Pertek district is 4.5 km in, with a 26-meter wide 2x2 lane. The other part the road is 28.5 km in length, a 12-meter wide 2x1 lane. The road surface is hot mix bituminous asphalt layer. The route of the road is improved in both vertical and horizontal alignments. In addition to the mechanic and asphalt layers, the project involves a significant amount of earthworks and structural works.


Client: General Directorate of Highways (TCK)

Location: Tunceli/Türkiye

Construction Period: 2013-2018