Construction Methodology
Access to the main road is provided through a network of service roads. The project includes 3 grade-separated interchanges and a viaduct measuring 2,657 meters in length. In addition, bituminous hot mix asphalt was applied throughout the road. The project also features Türkiye’s longest bridge, measuring 2,593 meters, making it a remarkable infrastructure achievement within the scope of the Samsun Peripheral Motorway.
Client: General Directorate of Highways (TCK), Department of Programming and Monitoring
Location: Samsun/Türkiye
Construction Period: 2013-2014