DEĞİRMENÜSTÜ
HYDROPOWER PLANT

The project includes a regulator, settling basin, transmission channel, transmission tunnel (2870 m), forebay pool, circular section pressurized transmission tunnel (1320 m), penstock, powerhouse, tailwater channel, and electrical substation.

Energy

Değirmenüstü Hydropower Plant
We Are Shaping the Future!

Installed Power:

40 MW


Commisioned in:

2008


Annual Generation:

114,26 GWh


Location:

Maraş/Türkiye


Commercial Operation:

Değirmenüstü HPP started commercial operation on 05.12.2008.


Production:

The generated electricity is transmitted to the interconnected system through the Andırın substation connection and an 8 km, 33 kV energy transmission line.