The project includes a regulator, settling basin, transmission channel, transmission tunnel (2870 m), forebay pool, circular section pressurized transmission tunnel (1320 m), penstock, powerhouse, tailwater channel, and electrical substation.
HYDROPOWER PLANT
Energy
Installed Power:
40 MW
Commisioned in:
2008
Annual Generation:
114,26 GWh
Location:
Maraş/Türkiye
Commercial Operation:
Değirmenüstü HPP started commercial operation on 05.12.2008.
Production:
The generated electricity is transmitted to the interconnected system through the Andırın substation connection and an 8 km, 33 kV energy transmission line.