Derya HPP consists of a regulator, a settling basin, a transmission channel, a forebay pool, a penstock, a powerhouse, a tailwater channel, and power transmission lines.
HYDROELECTRIC POWER PLANT
Energy
Installed Power:
18 MW
Commisioned in:
2021
Annual Generation:
47 GWh
Location:
Gümüşhane/Türkiye
Commercial Operation:
Derya HPP started commercial operation on 13.06.2021.
Production:
The electricity generated at the power plant is connected to Torul HEPP 154 kV Substation via a 5.0 km 33 Kv Power Transmission Line and transmitted to the interconnected system.