Doğankaya HPP consists of a regulator, a settling basin, a transmission channel, a forebay pool, a penstock, a powerhouse, a tailwater channel, and power transmission lines.
DOĞANKAYA
HYDROPOWER PLANT
HYDROPOWER PLANT
Energy
Doğankaya Hydropower Plant
We Are Shaping the Future!
Installed Power:
21 MW
Commisioned in:
2012
Annual Generation:
82,71 GWh
Location:
Adıyaman/Türkiye
Commercial Operation:
Doğankaya HPP started commercial operation on 20.04.2012.
Production:
The generated energy is transmitted to the interconnected system via an 8.3 km long 31.5 kV power transmission line.