Gök HPP consists of a regulator, a settling basin, a transmission channel, a forebay pool, a penstock, a powerhouse, a tailwater channel, and power transmission lines.
HYDROELECTRIC POWER PLANT
Energy
Installed Power:
14 MW
Commisioned in:
2019
Annual Generation:
47 GWh
Location:
Osmaneli/Türkiye
Commercial Operation:
Gök HPP started commercial operation on 01.10.2019.
Production:
The electricity generated at the power plant is connected to Paşalar substation via a 2.8 km 31.5 Kv Power Transmission Line and transmitted to the interconnected system.