KASIMLAR I-II DAM &
HYDROELECTRIC POWER PLANT

Kasımlar Dam and HPP structures consist of two power plants, two regulators, one RCC dam (90m), a settling basin, and tunnels totalling 15.0 km. The longest tunnel is 7.4 km long.

Energy

Kasımlar I-II DAM & Hydropower Plant
We Are Shaping the Future!

Installed Power:

100 MW


Commisioned in:

2016


Annual Generation:

268,56 GWh


Location:

Isparta/Türkiye


Commercial Operation:

Kasımlar I-II Dam & Hydroelectric Power Plant started commercial operation on 28.10.2016.


Production:

The generated energy is transmitted to the interconnected system via a 6 km long 33 kV power transmission line.