Kasımlar Dam and HPP structures consist of two power plants, two regulators, one RCC dam (90m), a settling basin, and tunnels totalling 15.0 km. The longest tunnel is 7.4 km long.
KASIMLAR I-II DAM &
HYDROELECTRIC POWER PLANT
HYDROELECTRIC POWER PLANT
Energy
Kasımlar I-II DAM & Hydropower Plant
We Are Shaping the Future!
Installed Power:
100 MW
Commisioned in:
2016
Annual Generation:
268,56 GWh
Location:
Isparta/Türkiye
Commercial Operation:
Kasımlar I-II Dam & Hydroelectric Power Plant started commercial operation on 28.10.2016.
Production:
The generated energy is transmitted to the interconnected system via a 6 km long 33 kV power transmission line.