CONSTRUCTION OF PERTEK - TUNCELİ ROAD CH: 24+500 - 57+538.04


Route of the project is located between Elazığ ferry intersection and Tunceli-Elazığ trunk road junction. The total length of the road is 33 km. Length of the road passing though Pertek district is 4.5 km in, with a 26-meter wide 2x2 lane. The other part the road is 28.5 km in length, a 12-meter wide 2x1 lane. The road surface will be a hot mix bituminous asphalt layer. The route of the road will be improved in both vertical and horizontal alignments. In addition to the mechanic and asphalt layers, the project involves a significant amount of earthwork and structural works.

Authority: General Directorate of Highways (KGM)
Location: Tunceli - Turkey
Construction Duration: 28 months


       

PROJECT MAIN QUANTITIES

       
Earthworks Structural Concrete Works Stone Wall Base - Sub base Worksi
7.165.000 m³ 52.000 m³ 78.300 m³ 355.000 ton
       
Asphalt Works      
173.000 ton      
       